In this method, a circular gap is excavated up into the depth at which the soil will stand unsupported (about 0.5m for gentle clay and 2m for rigid clay). Vertical boards referred to as laggings, are then established in position across the excavated deal with and they are held tightly https://riverasdnx.laowaiblog.com/29993005/pile-foundation-construction-bangladesh-options